LBFL: International Investment, Global Engineering and Financial Consulting
About Us
  • About Company
  • Investment Project Financing
  • Long-Term Loans
  • Lending up to 90%
  • Refinancing
  • Finance and Technology
  • Latest Projects
  • Questions and Answers
Industries
  • Finance
  • Consulting
  • Real Estate
  • Power
  • Oil and Gas
  • Mining and Handling
  • Industry and Environment
Financing
  • Thermal Power Plants
  • Hydroelectric Power Stations
  • Solar Power Plants
  • Wind Farms
  • Electrical Substations
  • Waste Processing Plants
  • Water Treatment Plants
  • Sea Ports and Terminals
  • Liquefied Natural Gas Plants
  • LNG Regasification Terminals
  • Mining and Processing Plants
  • Chemical Plants
  • Mineral Fertilizer Plants
  • Cement Plants
Publications
Contact Us
    English
    • Русский язык
    English
    • Русский язык
    LBFL: International Investment, Global Engineering and Financial Consulting
    About Us
    • About Company
    • Investment Project Financing
    • Long-Term Loans
    • Lending up to 90%
    • Refinancing
    • Finance and Technology
    • Latest Projects
    • Questions and Answers
    Industries
    • Finance
    • Consulting
    • Real Estate
    • Power
    • Oil and Gas
    • Mining and Handling
    • Industry and Environment
    Financing
    • Thermal Power Plants
    • Hydroelectric Power Stations
    • Solar Power Plants
    • Wind Farms
    • Electrical Substations
    • Waste Processing Plants
    • Water Treatment Plants
    • Sea Ports and Terminals
    • Liquefied Natural Gas Plants
    • LNG Regasification Terminals
    • Mining and Processing Plants
    • Chemical Plants
    • Mineral Fertilizer Plants
    • Cement Plants
    Publications
    Contact Us
      English
      • Русский язык
      English
      • Русский язык
      LBFL: International Investment, Global Engineering and Financial Consulting
      English
      Русский язык
      • About Us
        • Back
        • About Us
        • About Company
        • Investment Project Financing
        • Long-Term Loans
        • Lending up to 90%
        • Refinancing
        • Finance and Technology
        • Latest Projects
        • Questions and Answers
      • Industries
        • Back
        • Industries
        • Finance
        • Consulting
        • Real Estate
        • Power
        • Oil and Gas
        • Mining and Handling
        • Industry and Environment
      • Financing and Engineering
        • Back
        • Financing and Engineering
        • Thermal Power Plants
          • Back
          • Thermal Power Plants
          • Financial model for a thermal power plant
          • Thermal power plant project financing
          • Commercial and industrial loan for thermal power plant
          • Thermal power plant design
          • Thermal power plant construction
          • Thermal power plant modernization
        • Hydroelectric Power Stations
          • Back
          • Hydroelectric Power Stations
          • Financial model for a hydroelectric power plant
          • Hydropower plant project financing
          • Commercial and industrial loans for hydropower plants: bank funding
          • Hydropower plant design
          • Hydropower plant construction
          • Hydropower plant modernization
        • Solar Power Plants
          • Back
          • Solar Power Plants
          • Financial model of the solar energy project
          • Solar power plant project financing
          • Industrial and commercial loans for solar power plants: bank financing
          • Solar power plant design
          • Solar power plant construction
          • Solar thermal power plant construction
          • Solar power plant modernization
        • Wind Farms
          • Back
          • Wind Farms
          • Financial model of the wind farm project
          • Wind farm project financing
          • Commercial and industrial loans for wind farms: bank financing
          • Wind farm engineering services
          • Wind farm construction
          • Wind power plant modernization
        • Electrical Substations
          • Back
          • Electrical Substations
          • Financial model of electrical substation
          • Electric substation financing
          • Substation design
          • Substation construction
          • Substation modernization
        • Waste Processing Plants
          • Back
          • Waste Processing Plants
          • Financial model for waste processing plant
          • Waste processing plant financing
          • Waste recycling plant design
          • Waste processing plant construction
          • Waste processing plant modernization
        • Water Treatment Plants
          • Back
          • Water Treatment Plants
          • Financial model of water treatment plant
          • Wastewater treatment project financing
          • Wastewater treatment plant design
          • Wastewater treatment plant construction
          • Wastewater treatment plant modernization
        • Sea Ports and Terminals
          • Back
          • Sea Ports and Terminals
          • Financial model of the seaport
          • Financing for seaport projects
          • Seaport engineering design
          • Seaport construction
          • Seaport modernization and expansion
        • Liquefied Natural Gas Plants
          • Back
          • Liquefied Natural Gas Plants
          • LNG plant financial model
          • LNG plant project financing
          • LNG plant design
          • Construction of liquefied natural gas plants
        • LNG Regasification Terminals
          • Back
          • LNG Regasification Terminals
          • LNG regasification terminal project financing
          • LNG regasification terminal design
          • LNG regasification terminal construction
        • Mining and Processing Plants
          • Back
          • Mining and Processing Plants
          • Financial model of a mining and processing plant
          • Mining and processing plant financing
          • Mining and processing plant design
          • Mining and processing plant construction
        • Chemical Plants
          • Back
          • Chemical Plants
          • Financial model of a chemical plant
          • Chemical plant project financing
          • Chemical plant design
          • Chemical plant construction
          • Chemical plant modernization
        • Mineral Fertilizer Plants
          • Back
          • Mineral Fertilizer Plants
          • Financial model of a mineral fertilizer plant
          • Mineral fertilizers plant financing
          • Mineral fertilizer plant design
        • Cement Plants
          • Back
          • Cement Plants
          • Financial model for a cement plant
          • Cement plant project financing
          • Cement plant design
          • Cement plant construction
          • Cement plant modernization
      • Publications
      • Contact Us
      Burj Khalifa 144th & 146th Floor, Sheikh Mohammed bin Rashid Blvd, Downtown Dubai - UAE
      info@skywalk-investgrp.com
      • Home
      • Industries
      • Power
      • Financing biomass energy projects

      Financing biomass energy projects

      • Biomass energy project financing: long-term loan
      Service
      Financing and lending for biomass energy projects

      Skywalk Investment Group offers:

      • Investment financing from $ /€ 5 million or equivalent and more
      • Minimizing the contribution of the project promoter
      • Investment loan term up to 20 years
      • Credit guarantees
      Sector
      Power
      Ask a Question
      Our specialists provide comprehensive support for the implementation of your project
      Skywalk Investment Group offers financing and lending for biomass energy projects such as thermal power plants and district heating systems in agricultural municipalities.

      ►  We offer project finance and investments: from $ /€ 5 million or equivalent with a loan duration up to 20 years
      Against the background of growing interest in renewable energy, more companies are increasing financing and investment in biomass energy projects around the world.

      Agriculture and forestry has enormous potential for the production of biomass for the generation of electricity and heat. Modern biomass energy projects are able to produce natural gas from silage and manure, which is especially important for countries that are heavily dependent on hydrocarbon imports.

      This growing sector is based on agricultural residues, wood waste, as well as on special energy crops, the cultivation of which has begun to grow rapidly in recent years around the world.

      Woody biomass, cereal straw, corn production waste and other agricultural waste can become a valuable fuel for biomass thermal power plants.

      These projects, which are mainly implemented in developed agricultural areas, differ from other RES projects with low initial capital investments and are completely independent of fossil fuels, being tied to local agricultural production.

      However, the cost of such projects varies widely from 1 to 5 million euros per 1 MW of installed capacity, which requires a flexible professional approach to financing biomass energy projects.

      Skywalk Investment Group offers long-term financing for large energy projects, including loans for the construction of biomass thermal power plants.

      Our experienced financial team is ready to provide you with comprehensive support at all stages of the investment project, guiding you from the stage of pre-investment studies and contracting to the operation of the finished facility.

      Investment aspects of biomass energy projects

      Electricity generation from biomass thermal power plants is considered to be one of the most challenging businesses in the green energy sector from an economic and operational point of view. This can be explained by three factors listed below.

      First, biomass energy projects are heavily dependent on a continuous supply of large volumes of organic waste. Unlike solar power plants and wind farms, which operate on "endless" natural resources, a biomass thermal power plant is very demanding in terms of logistics, which includes the interconnected processes of harvesting, transporting and processing agricultural or wood waste.

      This means additional costs. A 10 MW thermal power plant uses about 15,000 cubic meters of wood chips per month, or about 30 trucks per day.

      Companies should also take into account the growing competition in the fuel market due to the gradual replacement of natural gas in heat production. This means rising prices for organic waste and the continued complexity of logistics processes.

      Of course, the cost of biomass is not commensurate with the current prices of natural gas and fuel oil, which skyrocketed amid the geopolitical upheavals of 2022, but each project requires an individual approach to comparing LCOE and determining economic feasibility.

      Secondly, high technical complexity and operating costs. Compared to other renewable energy projects, biomass thermal power plants are the most difficult to operate. For example, the 10 MW thermal power plant mentioned above may require the installation of about 2000-3000 sensors of various types, which, combined with sophisticated control systems, will require hundreds of thousands of euros for maintenance, periodic repairs and upgrades.

      Biomass thermal power plants require annual scheduled repairs, as well as the training and maintenance of a significant number of personnel, including highly qualified engineers.

      This is similar to the processes that take place at any thermal power plant in the conventional energy sector.

      The third important aspect is the construction period. The construction of a biomass thermal power plant requires 2-3 years, including the stages of engineering design, construction and installation of equipment. In comparison, a medium-sized solar power plant can be built using modern technology in an average of 18 months (much depends on the technology used).

      Some investment experts draw attention to another problem of biomass energy. Capital costs in the construction of solar power plants and wind farms are decreasing from year to year, but equipment for thermal power plants is only becoming more expensive due to inflation and the lack of significant investment in new technologies. Solar panels have fallen in price over the past two years by 30%, unlike steam turbines and boilers.

      The payback period in the biomass energy sector today reaches 5–7 years, while in solar and wind energy investors return their funds in 3–5 years.

      Benefits of biomass energy for investors and local economy

      What are the investment benefits of generating energy from biomass?

      Biomass thermal power plants have a number of parameters that make their development highly desirable both for business and for the energy system and for the economy as a whole.

      The first of the benefits of such projects is considered to be a stable mode of operation. Thermal power plants on biomass and biogas generate a relatively stable amount of energy during the day and, unlike solar and wind energy, do not require replacement capacities. This is extremely important for developing agricultural countries, where the lack of flexible capacity is one of the potential barriers to renewable energy.

      The development of the regional economy is also important. In this context, companies should develop the collection, delivery and preparation of organic waste (eg drying and crushing).

      Investment and financial aspects of biomass energy projects

      According to leading experts, the minimum distance between biomass TPPs should be 200-250 km, since the economically viable distance for the supply of organic waste for energy generation should not exceed 100-150 km.

      This means the development of nearby regions and their labor market.

      In the solar and wind energy sectors, it is mainly based on imported equipment, but in the biomass energy sector, the share of the local component is extremely high.

      This, among other things, is an additional incentive for local companies, allowing them to develop other types of business and get the maximum profit from agricultural activities.

      The third benefit of such projects is, of course, the substitution of natural gas. For example, the Eastern European states, which are heavily dependent on imported hydrocarbons, can diversify their energy mix by financing biomass thermal power plants. Agricultural countries such as Poland or Ukraine annually produce several tens of millions of tons of agricultural biomass, in addition to millions of tons of logging residues.

      However, this huge potential is not yet effectively used.

      Project finance for biomass energy projects

      Project finance (PF) can be defined as raising capital from limited resources to finance a project with separate capital, where the capital provider primarily relies on the project's cash flow as a source of debt servicing.

      The PF is applicable to large-scale projects involving the private or public sector, including the construction of thermal power plants using biomass and biogas.

      Financing is carried out through specially established financial structures with a high proportion of borrowed funds. Since lenders rely only on future profits from the sale of electricity and heat, the partners conduct an in-depth study of the risks at the stage of planning and preparation of financing.

      Financing of biomass thermal power plants projects through PF schemes is carried out by the off-balance method. This means that the project debt does not affect the capital structure of the sponsors, and all funds are attracted by a separate legal entity, a special purpose vehicle (SPV). The latter is especially important for small companies that initiate capital-intensive projects and require borrowed funds that significantly exceed their own authorized capital.

      On the one hand, project finance for energy projects looks attractive given that the deal is off the balance sheet and the sponsor's creditworthiness remains unchanged (something that does not happen with conventional loans).

      When deciding whether to issue loans, banks do not focus on the solvency or liquidity of SPV, but on the cash flows that a particular project will generate.

      The main disadvantage of the PF is the high cost of debt capital, which makes this scheme suitable only for large projects with strong cash flows sufficient to service the debt. It also implies the need for complex project structuring, including adequate collateral and insurance to mitigate risks.

      When structuring project finance, risk reduction is vital given that it leads to greater confidence in the project company's future cash flows.

      To a large extent, effective risk control is carried out by entering into contracts with various stakeholders, which is why the PF is considered a legally difficult way to finance biomass energy projects.

      The following contracts are concluded in the structuring of project finance:

      Contract Description
      Construction contract The scope of this document is usually defined by the concept of EPC (engineering, procurement, construction), which covers all stages of design, equipment purchase and installation, civil works, commissioning and start-up of the power plant. The key to success in EPC contracting is the experience of contractor, which largely determines the quality, adherence to schedule and the risk of cost overruns.
      Administration, Operations and Maintenance (AOM) contracts These contracts are required after the commissioning of the biomass project as a professional contractor is required to manage, operate and perform the related maintenance of the high technology equipment. As in the case of construction contracts, AOM contracts must be executed by companies with the appropriate technical capability and experience, since improper maintenance of assets can lead to their failure, which will affect future cash flows, in addition to a direct impact on the life of the equipment and on project lifespan.
      Supply contracts This type of contracts are necessary to ensure the supply of fossil fuels (straw, sawdust, manure). They are usually negotiated on a take-or-pay basis, meaning the buyer's obligation to pay whether the company currently needs the product or not. Since biomass thermal power plants are highly dependent on the supply of fossil fuels from nearby farms, long-term contractual relationships with these suppliers are critical for future investment projects of this type.
      Power Purchase Agreement (PPA) In the early stages, it is necessary to conclude long-term contracts that ensure the sale of products or services created by the SPV. Contracts for the sale of electricity and heat will allow project participants to predict future cash flows and ensure their safety.

      Project finance for biomass energy projects

      Based on the project finance contract structure above, we can see the main participants in a typical biomass energy project.

      Each of these participants plays an important role in the project, which should be properly reflected in the contract structure:

      • SPV. This is a special company that is established for the implementation of a specific investment project, it will also be responsible for maintaining the debt, making appropriate payments and distributing profits.

      • Sponsors. Sponsors refers to those companies that are interested in the development of the project, the supply of green energy from biomass and the implementation of other projects closely related to the biomass thermal power plant.

      • Capital providers. This group includes numerous financial institutions and companies that will be responsible for providing the resources needed to develop the project. They must finance the purchase of technology, construction and operation. Among the companies financing a biomass energy project, there may be technology giants that, in order to stimulate their sales, may establish lending schemes or even leasing schemes.

      • Insurance companies. These project finance participants are required to provide insurance coverage and mitigate the risks associated with the project.

      There is now a wide range of funding sources for biomass projects, which enhances the ability of SPVs to obtain long-term funding outside the host country's domestic financial market.

      These are not only traditional investment loans, bonds and leasing instruments, but also numerous alternative financial models widely used in renewable energy and other innovative sectors of the economy.

      The sources of financing for such projects can be international financial institutions (EBRD, IFC, African Development Bank, Inter-American Development Bank), commercial and state banks, credit unions, municipalities, government bodies, leasing companies, equipment manufacturers, agricultural producers, as well as various investment funds, willing to invest in biomass energy projects in exchange for participation in them through shares, warrants, convertible bonds, etc.

      If you are looking for long-term financing for a major energy project, please contact SWIG for advice.

      Our team is ready to develop a customized investment solution for any project, taking into account your goals, business scale, tax incentives, as well as any restrictions and time frames.

      Industries and Services
      Investment consulting
      Investment consulting
      Refineries: lending and financing
      Refineries: lending and financing
      International bank loans
      International bank loans
      Investment strategy development
      Investment strategy development
      Commercial real estate (CRE): lending and financing
      Commercial real estate (CRE): lending and financing
      Cash flow management services
      Cash flow management services
      Reduction and minimization of project financing costs
      Reduction and minimization of project financing costs
      Attraction of investments and bank loans
      Attraction of investments and bank loans
      Financial modeling
      Financial modeling

      Financing and Engineering
      Financial model of the wind farm project
      Financial model of the wind farm project
      New financial models for the construction of wind farms are promoting the development of renewable energy through the implementation of large projects.
      Financing for seaport projects
      Financing for seaport projects
      Skywalk Investment Group offers project finance services for the construction of seaports and long-term loans for the modernization of port infrastructure.
      Cement plant project financing
      Cement plant project financing
      The concept of long-term project finance (PF) for the construction of cement plants plays an important role in the global economy.
      Solar thermal power plant construction
      Solar thermal power plant construction
      Our company offers comprehensive services related to the financing and construction of solar thermal power plants anywhere in the world.

      Publications
      Publications
      Investment financing: project finance vs corporate finance
      Investment financing: project finance vs corporate finance
      The choice between project finance (PF) and corporate finance depends on many factors, understanding which can be the key to investment success.
      Comparison and selection of investment projects
      Comparison and selection of investment projects
      The success of investments largely depends on high-quality analysis and comparison of investment projects at the decision-making stage.
      Project finance for compound feed plants
      Project finance for compound feed plants
      Skywalk Investment Group offers financing for large projects, including project finance schemes for compound feed plants and other feed industry facilities.
      Covered bonds: history, regulations and current practice
      Covered bonds: history, regulations and current practice
      Covered bonds issued over several centuries can become an important source of financing for banks and an incentive for the development of the real sector of the economy.
      To consider an application for financing, fill out the form and send it to us by e-mail along with the project brief, or contact our experts
      Ask a Question

      Back to list Next project
      © 2024 Skywalk Investment Group. All Rights Reserved
      Address
      Burj Khalifa 144th & 146th Floor, Sheikh Mohammed bin Rashid Blvd, Downtown Dubai - UAE
      Cookies | Notice | Privacy Notice | Disclaimer | Sitemap